Cuda 12000 IP Access Switch Installation Guide
Connecting Power 115
Figure 5-15 Covering the Power Connectors
You must now cable the power sources to the fan tray assembly, as
described in “Connecting Power to the Fan Tray”.
Connecting Power to the Fan Tray
The fan tray assembly supports connection to redundant power sources. Use
No. 16 gauge electrical wire to connect the power sources to the fan tray. To
cable the power sources to the fan tray assembly, use the following
procedure:
WARNING: Before cabling system power, you must review, understand, and
follow these guidelines and precautions:
Before you connect the power sources to the system, be sure that the
circuit to which you are connecting the system is off so that all power is
removed from the circuit and the wires that you are connecting.
Take care not to overload the power supply circuit to which you are
connecting the system.
Before proceeding with connecting the power lines to the system,
remove all jewelry such as rings, watches, and necklaces.
Do not work alone whenever potentially hazardous conditions exist.
Before beginning the power cabling procedure, locate the emergency
power-off switch for the location in which you are working
Captive Cover Screw
Captive
Thumbscrew
Resistance
Clasp
Cover
Opening
Seitenansicht 114
1 2 ... 110 111 112 113 114 115 116 117 118 119 120 ... 167 168

Kommentare zu diesen Handbüchern

Keine Kommentare